Delivering Excellence Again at Datacom Head Office
When a client trusts you with a second complex project, you know you've set the bar high. We're proud to share that last month, our team at Rise Contracting successfully completed another intumescent coating replacement — this time inside the Datacom Head Office — for the same building owner who engaged us a year earlier at the Fonterra Head Office.
The scope mirrored our previous success: Complete removal of a failing intumescent system and reinstatement of certified fire protection — all within a live, operational corporate environment.
What Made This Project Different?
While the scope was familiar, every building presents its own challenges. Drawing on the lessons and systems perfected at Fonterra, we once again delivered:
Minimal Disruption in a Live Environment.
Work conducted outside business hours to protect daily operations.
Protective barriers, plastic sheeting partitions, and floor protection installed throughout.
Strict safety protocols ensuring zero incidents in an occupied space.
Precision Without Power Tools.
Specialized hand tools with carbide inserts for controlled removal.
Chemical solutions to soften existing coatings.
Meticulous step-by-step cleaning with continuous quality checks.
Team Coordination at Its Best.
Our crew worked in sync, rotating positions and tools to maintain efficiency.
Daily monitoring and task prioritization kept us on track from start to finish.
Why This Repeat Engagement Matters?
When the same client returned to us a year later, it wasn't just because we delivered the Fonterra project on time. It was because we delivered it with:
Professionalism in a sensitive environment.
Ingenuity when faced with restrictions.
Quality that stands up to independent scrutiny.
Thank you to Bayleys Property Services for your continued trust. Thank you to Datacom for your cooperation and flexibility.